I tried chasing after the whole work of how the "Lapping Ropeway" of the theater version Fate was born



"Saturday September 23, 2017 to October 9 (Monday) will be held from"Machi ★ Asobi vol.19At the main stage, there is a main route that carries people to the top of Mt. BizanMeishan Ropeway. Machi ★ Asobi has so farWrapping busYaWrapping taxisAlthough it has a track record of running, this time, wrapping is given to the ropeway for the first time despite using it from vol.1. I showed how the ropeway gondola wrapping work is done.

Machi ★ Asobi vol.19 2017.09.23 ~ 10.9 held
http://www.machiasobi.com/

I was in charge of wrapping the ropewayAcai marking system. Looking at the official websiteWrapping results of Shinkansen and aircraftAlthough it is posted, it seems that this is the first time for a ropeway.

Because the ropeway operates normally as from 9 o'clock to 21 o'clock, the wrapping work took place from 21 o'clock when the operation ended. To see the state of the work, go to the Awaodori-kai in the evening.


The 5th floor of the hall is the departure point of the ropeway. Being on the other side of the house is the gondola of "wrapping sword sword dance" wrapping which finished work on the previous day.


In order to unload the unwrapped gondola from the summit station, we went to the top of the mountain in exchange.


After 7 minutes we got off the unwrapped gondola. Since the wrapping material has already been carried on the 5th floor, we will wipe off dirt and water droplets etc on the gondola surface immediately.


The first thing to paste is the door. As this gondola just protrudes a full round of the position of the waist of the main body, it is necessary to paste considering the protrusion.


Meanwhile, another artisan started wrapping the color part at the top of the gondola.


This gondola's wrapping is the one of "Theater version" Fate / stay night [Heaven's Feel] ", the foot side gondola is used the illustration of the first key visual, one of the prepared wrapping sheets is just cherry With a face, I was staring at here.


The gondola is in a state where the side with the door is sideways to the home so you can work as it is, but the side without the door is the work of setting the ladder from the bottom like this.


The left door lower part, upper part, right door lower part and pasting are done ......


The face part of the cherry tree of the previous time was stuck on the upper part of the right door.


Gently stretch the sheet ......


The door part is almost completed.


Next, the gondola side. There was no opening / closing part like a door here, so we temporarily fastened a big sheet as it was.


Then paste it and adjust the parts such as fine protrusions.


The part that looked like a bulge was a ventilation opening, so the seat was removed afterwards. The boundary with unwrapping is such a feeling, the original is based on red and yellow, so the impression changes considerably if it is black or violet based "Fate" color.


Lastly, I heated the sheet with a heat gun and pasted it.


In addition, although the feeling that I saw at a glance is linear, since it is in a warped shape toward the bottom, I made a notch around the border with the bottom so that wrinkles do not appear properly.


Meanwhile the upper wrapping was about to reach the full circumference.


Subsequently, the same large sheet attachment began on the foot side.


Cherry blossoms are arranged just in the center of the gondola.


The work of the second gondola began as the finish of the first one approached.


A sheet with a logo was pasted on the ledge above the cherry blossoms.


Handle the headlight part and the remaining part of the side ... ...


Completion.


The gondola door side is like this. The red and orange parts were all dyed black and purple, and a heavy impression of gondola.


This is the mountain side.


And the foot side.


Compared to the gondola where wrapping has not yet been completed from the opposite home, it is like this. Work started from 21 o'clock and the first gondola's wrapping was completed at 25 o'clock. On the way, I had about 4 hours of work while taking a break. Furthermore, since the gondola is a set of two units, it is the second wrapping from here.


I am sorry that there is less opportunity to see the whole compared to wrapping buses and wrapping taxis, but since it is performing wonderful wrapping, please take a closer look back and forth when you get on the train.

in Coverage,   Ride, Posted by logc_nt