GIGAZINE Editing department's building is renovated in all processes · Total finish



Mobius CorporationRemodeling was done,Destruction·PlaybackAfter the interior changed from Japanese style to Western style through, we will paste the wallpaper from here and make the final finish.

The final renovation of the renovation that changes to an entirely different impression depending on the wallpaper is from the following. Wallpaper arrived.


We are preparing to paste the wallpaper.


It seems to be boring at first glance at the preparation stage.


Transfigured to such a feeling when sticking wallpaper.


I also put wallpaper on the stairs.


It became a western-style style from a natural atmosphere.


I will rewrite the part left black on the ceiling also white.


Change to pure white.


Along with the working naked light bulb, a new mysterious atmosphere.


Put a wallpaper and it looks fresh.


Finally paste the flooring material and finish. It took about 5 days, including cleaning, from the start of pasting wallpaper to delivery.


Introduced in the movie how much it changed before and after renovation.

BEFORE


AFTER


Apart from the room it was renovated with the following feeling.

Kitchen BEFORE


Kitchen AFTER (gas was not the last time because gas was the cause of the previous fire)


Toilet BEFORE


Toilet AFTER


Bathroom BEFORE


Bathroom AFTER


Stairs BEFORE


Stairs AFTER


That's why it took 25 days to complete renovation. Work on Sundays and holidays is closed, so it has been nearly a month since the collapse of the Japanese style room, renovation to the Western-style room, changing the position of the toilet and the bathroom was a big remodeling.

in Review,   Video,   Notice,   Column, Posted by darkhorse_log